Most small cities and counties have an emergency operations plan. Far fewer have a plan for keeping the government itself running when city hall floods, the network is locked by ransomware or the clerk, the manager and the finance director are all out at once. That second plan is continuity of operations, and it does not have to be large to work.

FEMA's continuity guidance is written for exactly this audience. The Continuity Guidance Circular (February 2018) is a resource for federal and non-federal entities, including local governments (FEMA, Continuity Guidance Circular). FEMA also publishes a fill-in template for non-federal entities. Between the two, a small jurisdiction has most of what it needs.

What are essential functions?

FEMA defines essential functions as activities and tasks that cannot be deferred during an emergency. They must run continuously or resume quickly after a disruption. Functions that are important but can wait are not essential, and FEMA notes that even some essential functions may be able to wait several days before resumption (CGC, p. 18).

FEMA's non-federal template gives a practical test: an essential function is one that cannot be left undone for 30 days without risking failure of mission or loss of trust, respect and funding (FEMA, Continuity Plan Template for Non-Federal Entities, August 2018, p. 1).

That 30-day test is FEMA's benchmark, not a rule every organization has to adopt. Each organization has to identify its own essential functions, put them in priority categories, and define each one by how long it can go without being performed. That step is the backbone of the plan. It gives you the framework for cross-training staff, and it forces an honest decision about which operations will not continue during an event. Those decisions have consequences: lost production, suspended services, and staff reassigned to other work on different schedules depending on the incident and the hazard. A common example is the labor agreement. If activating the continuity plan changes assignments, shifts or work locations, the union contract has to allow for it, and the time to work that out is before the plan is ever activated.

For a small city or county, the list is usually shorter than people expect. It tends to include:

FEMA recommends grouping functions into priority categories rather than building one long ranked list (CGC, p. 18). Three tiers are enough: must continue without interruption, must resume within days, and can wait.

Who is in charge when the people in charge are not there?

Orders of succession are formal, sequential listings of positions, not names of individuals, that identify who assumes a role when the incumbent cannot serve. FEMA advises establishing and documenting them in writing in advance and aligning them with applicable law (CGC, pp. 21-23).

The template adds detail that matters in a small organization. Designate at least three individuals, where possible, for each essential function. List successors in order, by position rather than name. Spread them geographically where you can, have legal counsel review the list, and keep it with your essential records (Non-Federal Template, p. 10).

Succession says who. Delegations of authority say what that person may legally do. FEMA's template calls for written delegations that cover the order of successors, the legal authority for policy decisions, how authority transfers, what may and may not be assumed, limits on re-delegation, and the circumstances that start and end the delegation. They need legal review and signatures from the primary holder and the successors (Non-Federal Template, pp. 10-11).

In a town of a few thousand people, three-deep succession may mean reaching outside the department. That is fine, as long as it is written, legally reviewed and known to the people named.

What is devolution, and why does a small jurisdiction need it?

Devolution is the ability to transfer statutory authority and responsibility for essential functions to other staff and an alternate location when the primary organization cannot perform them (CGC, p. 20). For a large agency, that usually means another office. For a small city, it often means another government.

FEMA's guidance gives that example directly: a city could devolve functions to a neighboring city or its county, and a county could devolve to the state or a neighboring county. The circular also separates active triggers, a deliberate decision by leadership or elected officials, from passive triggers, when leadership is not available to initiate activation (CGC, pp. 20-21). FEMA's template adds that devolution to a separate organization requires a contract included in the plan, a trained personnel roster, and a way to restore authority to the primary organization (Non-Federal Template, pp. 23-24).

Plan for losing the building and the network

The CGC includes a case study that should sit on every county manager's desk. When Tropical Storm Irene hit Vermont on August 28, 2011, flooding and power outages made several state worksites unusable, including the State Emergency Operations Center, and displaced about 1,500 state employees. Each agency had a continuity plan, but several plan assumptions conflicted under long-term displacement: one agency's alternate site was another agency's primary site (CGC, p. 6).

Two lessons for small jurisdictions follow. First, check that your alternate site is not also the school district's or the county's alternate site. Second, do not assume telework will save you. FEMA notes that telework may not be viable during all incidents, such as cyberattacks and mass power outages (CGC, p. 20).

For the network, CISA's best practices for state, local, tribal and territorial governments include maintaining offline, encrypted backups of data, testing them regularly, and testing that staff can restore data fully and partially (CISA, Five Cybersecurity Best Practices for SLTTs). FEMA's template makes the same point for essential records: every essential record should be backed up outside the organization's servers (Non-Federal Template, p. 5).

A 90-day starter plan

A first continuity plan does not need to be finished in a quarter. A usable one can be.

Days 1-30: Decide what matters

Days 31-60: Decide who and where

Days 61-90: Write it down and test it

After that, keep it alive. FEMA's template recommends annual plan review, annual training for continuity personnel, alert and notification testing at least annually, and a functional or full-scale plan exercise annually over a multi-year period (Non-Federal Template, pp. 30-31, 36).

I worked on continuity planning for a large international airport, where the scale is very different from a small town. The core questions are the same: what cannot stop, who decides when the usual people are gone, and where the work moves if the building is lost. Answer those three in writing, and the rest of the plan follows.

Joel Yonkman is Principal Consultant of Emergency Response & Global Security Solutions (ERGSS), a national emergency management and security consulting firm. He served as Planning Section Chief on FEMA Region VI's Type 2 Incident Management Assistance Team from 2019 to 2023, was a primary instructor at the DHS Center for Domestic Preparedness, and began his career in the fire service and tactical EMS. He holds an M.S. in Disaster Medicine and Management from Philadelphia University.